Principles 16 and 17 close the Framework: the organisation selects, develops and performs ongoing and separate evaluations to ascertain whether the components of internal control are present and functioning, and it evaluates and communicates deficiencies in a timely manner to those responsible for corrective action. Neither binds anyone. COSO’s Framework is voluntary, no consequence follows from departing from it, and its standing rests on being the account of internal control that preparers, boards and auditors already work from. The reason these two matter more for a model-based control than for any other is a property the 2026 paper puts first: these systems are dynamic, because models, prompts and retrieval data change.
Set that against an annual or quarterly evaluation cadence and the mismatch is structural rather than a matter of diligence. A manual control operating correctly is unlikely to stop between two evaluations without an event — someone leaves, a system changes, volume spikes. A model-based control can degrade with no event the organisation would notice: the input population shifts, a supplier updates the model, or the world the model was fitted to moves. By the time a separate evaluation runs, the control may have been ineffective for most of the period under review, which is a different finding from "the control failed in March". The event-driven half of that is dealt with at re-evaluating when the vendor updates the model; this page is about the half with no event at all.
Ongoing evaluation for such a control therefore has to be a measurement rather than an observation, with a number attached in advance. The candidates are unglamorous and mostly already available: the proportion of items cleared without a person, the exception rate, the rate at which exceptions prove genuine, the distribution of confidence scores, and volumes by category against the prior period. Any of them moving is a prompt to look. What organisations skip is setting the threshold beforehand — without one, every movement is explicable after the fact, and the deficiency Principle 17 asks to be communicated is never identified as one. It is also worth stating plainly that where a person re-performs the work, drift surfaces in that person’s exceptions, which is one more reason the reliance determination decides how much monitoring machinery a control needs.