The evaluation is quarterly and the standard is prospective. The rule reaches any change occurring during the quarter that "has materially affected, or is reasonably likely to materially affect" internal control over financial reporting, and the second limb is the one that catches a newly deployed tool: a change whose consequences are not yet known satisfies it precisely because they are not yet known. Waiting for the first exception, the first missed match or the first restatement inverts the test. By the time a tool has demonstrably moved the ledger, the quarter in which somebody should have weighed it has closed.
The harder case is the change the registrant did not make. A supplier that retrains a model, adjusts a filter or repoints a retrieval connector has altered how a control behaves, and the rule asks about changes to the issuer's control rather than about changes the issuer authored. Supervisory practice in other regimes already treats a movement after go-live as an event carrying its own assessment — see post-deployment monitoring and model change — but the Exchange Act confers no right to be told. That right comes from the contract, which is what makes a change-notification clause a control rather than a procurement detail.
The disclosure itself is widely treated as though it were reserved for remediation. Item 308(c) copy is routinely drafted as an assertion that nothing altered except the fixing of a previously reported weakness, and few functions put a new tool through the determination they would apply to a new sub-ledger or a shared-services migration. Nothing in the text supports the narrower reading. Something either happened in the period or it did not, and whether it made the control better, worse or merely different is beside the point.
This is where the collection's central mismatch is at its plainest. Management weighs the position at four fixed moments in the year; a model moves whenever it is retrained, reconfigured or reprompted. More frequent evaluation does not close that gap — knowing when the system moved does, and that is a record somebody has to keep. The ethics code arrives at the same problem from the other direction, making an organisation's oversight of a technology across its lifecycle one of the factors bearing on whether its output may be relied on at all: see using the output of technology.